Home / Services / Independent reviews
Independent review of a quotation, BoQ or contractor's claim
You have a figure in front of you and nobody on your side to check it. Send it to me before you sign or pay. I tell you in writing whether it is fair, what is missing and what to ask for.
By Edwin, quantity surveyor, registered with IQSK. 10 years in practice. Fixed fee agreed in writing.
What I review
- A contractor's quotation or priced bill, before you accept it
- A bill of quantities prepared by someone else, before it goes to tender
- A payment application, before you pay it
- A claim for extra money or time
- The cost position of a project that has stalled or overrun
What I look for in a quotation
Whether the quantities match the drawings. Whether the rates are in line with current prices where the site is. What has been left out, because an omitted item is one you will pay for later at a price you did not agree. Whether early items are overpriced so that the contractor is paid ahead of the work. Whether the provisional sums are realistic.
You get a short report: the items that are fair, the items to query, the items missing, and what I think the work should cost. Most clients use it to negotiate; some use it to walk away.
Cost audit of a project in trouble
For a stalled or disputed project I measure the work in place, value it at the contract rates, and compare the result with what has been paid. The report states the position in plain figures: overpaid, underpaid, and by how much. It also estimates the cost to complete, which is the number you need before deciding whether to carry on with the same contractor.
How it works
Send the document and the drawings it is based on. I quote a fixed fee and a date. A review of a quotation for a house is normally quick, because the purpose is to help you before you commit. Everything you send stays confidential.
Independence
A review is only worth having if the reviewer has no stake in the answer. I take no commission from contractors or suppliers, and I do not review a document on a contract where I already act for the other side.
Questions clients ask
Is it worth reviewing a quote for a small job?
If the quote is for more than you would be comfortable losing, yes. The review fee is fixed and stated first, so you can decide.
Will the contractor know?
Only if you tell them. Many clients share the report, because it turns a negotiation about a total into a discussion of specific items.
Can you review a BoQ from another quantity surveyor?
Yes. I check the measurement against the drawings on the sections that carry most of the money and report any differences.
Get a fixed-fee quote
Send your drawings for independent reviews. You get a written scope, a fixed fee and a delivery date within two working days. No charge and no obligation for the quote.